Construction and Demolition Waste Management Rules, 2025
Construction and Demolition Waste Management Rules, 2016
- Earlier Construction and Demolition Waste was covered under the then existing Municipal Solid Wastes (Management and Handling) Rules, 2000.Ministry of Environment, Forest and climate change, Govt of India, has issued Notification No. G.S.R 445(E) Dated 29.03.2016 [published in the Gazette of India Ext. Pt II S.3(ii) on 27.04.2016] in respect of "Construction and Demolition Waste Management Rules, 2016". These Rules came into force with effect from 27.04.2016 (date of publication in Gazette of India).
- These Rules are applicable to every waste resulting from Construction, re-modelling, repair and demolition of any civil structure of individual or organization or Authority who generates construction and demolition waste such as building materials, debris,rubble. As per the said Rules, Delhi Pollution Control Committee is to grant Authorisation to Construction and Demolition Waste Processing Facility about 3448 TPD of Construction and Demolition Waste is generated in Delhi as per Annual Report for 2021-2022. There are following four Construction and Demolition Waste Processing Facilities operating in Delhi:
| S.No. | Name of Facility | Capacity (TPD) | Contact Details |
| 1. | M/s Indo Enviro Integrated Solutions Limited, Shastri Park | 1000 |
Mr. Shajahan Ali,Vice President Mob:-+91 9566233928 Email: shajahan[dot]a[at]indoenviro[dot]com |
| 2. |
M/s Indo Enviro Integrated Solutions Limited, Mundka |
150 |
Mr. Shajahan Ali,Vice President |
| 3. | M/s Indo Enviro Integrated Solutions Limited, Pocket I-2, Industrial Area Rohini, Phase V at Ranikhera | 1000 |
Mr. Shajahan Ali,Vice President |
| 4. | M/s Rise Eleven Delhi Waste Management Co.,Bakkarwala Village |
1000 |
Mr. Manoj Saxena, Director |
| 5. | M/s Indo Enviro Integrated Solutions Limited, Mundka (DMRC Site) | 150 |
Mr. Shajahan All, Vice President |
3. Processing of Construction and Demolition Waste consists of:
-
-
- Receiving of Construction and Demolition Waste at site
- Weighing(weigh bridge provided near gate/office)
- Grading( loose soil to landfill and road building)
- Sizing unit/breaking/processing
- Output [different sizes of aggregates, used in block making/ tiles making, road building, landfill, RMC(Ready Mix Concreate)].
-
- DownloadAnnual Report of C&D Waste Management for the year 2024-2025Date: 31-07-2025 | 9.64 MB
- DownloadAnnual Report of C&D Waste Management for the year 2023-2024Date: 30-10-2024 | 5.46 MB
- DownloadUse of Recycled Products from Construction & Demolition WasteDate: 06-07-2016 | 269.17 KB
- DownloadList of documents required while applying for Authorization under Construction & Demolition Waste Management Rules, 2016Date: 21-07-2016 | 4.92 KB
- DownloadFlow for Processing of applications and flow for user to apply under C&D Waste ManagementDate: 05-07-2022 | 651.26 KB
- DownloadOffice order dated 19-01-2023 regarding fees under Solid Waste Management Rules, 2016 and Construction and Demolition Waste Management Rules, 2016.Date: 19-01-0223 | 292.79 KB
- DownloadAnnual Report of C&D Waste Management for the year 2022-2023Date: 07-08-2023 | 1.09 MB
- DownloadAnnual Report of C&D Waste Management for the year 2021-2022Date: 29-07-2022 | 2.34 MB
- DownloadAnnual Report of C&D Waste Management for the year 2020-2021Date: 29-07-2021 | 6.8 MB
- DownloadAnnual Report of C&D Waste Management for the year 2019-2020Date: 30-07-2020 | 5.23 MB
Delhi Pollution Control Committee
