• inner-page-banner

Construction & Demolition Waste

Construction and Demolition Waste Management Rules, 2025
Construction and Demolition Waste Management Rules, 2016

 

  1. Earlier Construction and Demolition Waste was covered under the then existing Municipal Solid Wastes (Management and Handling) Rules, 2000.Ministry of Environment, Forest and climate change, Govt of India, has issued Notification No. G.S.R 445(E) Dated 29.03.2016 [published in the Gazette of India Ext. Pt II S.3(ii) on 27.04.2016] in respect of "Construction and Demolition Waste Management Rules, 2016". These Rules came into force with effect from 27.04.2016 (date of publication in Gazette of India).
  2. These Rules are applicable to every waste resulting from Construction, re-modelling, repair and demolition of any civil structure of individual or organization or Authority who generates construction and demolition waste such as building materials, debris,rubble. As per the said Rules, Delhi Pollution Control Committee is to grant Authorisation to Construction and Demolition Waste Processing Facility about 3448 TPD of Construction and Demolition Waste is generated in Delhi as per Annual Report for 2021-2022. There are following four Construction and Demolition Waste Processing Facilities operating in Delhi:           

 

S.No. Name of Facility Capacity (TPD) Contact Details
1. M/s Indo Enviro Integrated Solutions Limited, Shastri Park 1000

Mr. Shajahan Ali,Vice President

Mob:-+91 9566233928

Email: shajahan[dot]a[at]indoenviro[dot]com
2.

M/s Indo Enviro Integrated Solutions Limited, Mundka
(DMRC Site)

150

Mr. Shajahan Ali,Vice President
Mob:-+91 9566233928
Email: shajahan[dot]a[at]indoenviro[dot]com

3. M/s Indo Enviro Integrated Solutions Limited, Pocket I-2, Industrial Area Rohini, Phase V at Ranikhera 1000

Mr. Shajahan Ali,Vice President
Mob:-+91 9566233928
Email: shajahan[dot]a[at]indoenviro[dot]com

4. M/s Rise Eleven Delhi
Waste Management Co.,Bakkarwala Village
1000

Mr. Manoj Saxena, Director
Mob:-+91 9810883930
Email: riseelevenwastemanagement[at]gmail[dot]com

5. M/s Indo Enviro Integrated Solutions Limited, Mundka (DMRC Site)  150

Mr. Shajahan All, Vice President
Mob:-+91 9566233928
Email: shajahan[dot]a[at]indoenviro[dot]com

 

3. Processing of Construction and Demolition Waste consists of:

      • Receiving of Construction and Demolition Waste at site
      • Weighing(weigh bridge provided near gate/office)
      • Grading( loose soil to landfill and road building)
      • Sizing unit/breaking/processing
      • Output [different sizes of aggregates, used in block making/ tiles making, road building, landfill, RMC(Ready Mix Concreate)].
  • Annual Report of C&D Waste Management for the year 2024-2025
    Date: 31-07-2025 | 9.64 MB
    Download
  • Annual Report of C&D Waste Management for the year 2023-2024
    Date: 30-10-2024 | 5.46 MB
    Download
  • Use of Recycled Products from Construction & Demolition Waste
    Date: 06-07-2016 | 269.17 KB
    Download
  • List of documents required while applying for Authorization under Construction & Demolition Waste Management Rules, 2016
    Date: 21-07-2016 | 4.92 KB
    Download
  • Flow for Processing of applications and flow for user to apply under C&D Waste Management
    Date: 05-07-2022 | 651.26 KB
    Download
  • Office order dated 19-01-2023 regarding fees under Solid Waste Management Rules, 2016 and Construction and Demolition Waste Management Rules, 2016.
    Date: 19-01-0223 | 292.79 KB
    Download
  • Annual Report of C&D Waste Management for the year 2022-2023
    Date: 07-08-2023 | 1.09 MB
    Download
  • Annual Report of C&D Waste Management for the year 2021-2022
    Date: 29-07-2022 | 2.34 MB
    Download
  • Annual Report of C&D Waste Management for the year 2020-2021
    Date: 29-07-2021 | 6.8 MB
    Download
  • Annual Report of C&D Waste Management for the year 2019-2020
    Date: 30-07-2020 | 5.23 MB
    Download
Top